Recently Completed

Project
Name
Project
Overview
Completion Date
Lake Forest Sports Park Improvements - Phase 2 The project included a second phase of improvements at the Lake Forest Sports Park and Recreation Center. This project provided additional lighting at the south tot lot and the batting cages to eliminate dark shadows and extend the hours of use. The project also includes the construction and installation of handrails, guardrails, and steps in the terrace seating areas for an overall improved access to the multi-use fields and synthetic soccer fields. Spring 2017
Portola Parkway Widening and Streetscape  This project provided traffic safety and traffic congestion relief by widening one lane southbound on Portola Parkway. Design contract awarded to Civil Works in June 2014 and construction contract awarded to Kasa Construction in June 2016. 

Portola Parkway Widening Project Maps
Median Landscape Rendering 1
Median Landscape Rendering 2
Median Landscape Rendering 3
Winter 2016
ADA Ramp Improvements, Phase 8 - Tamarisk Park This project was the eighth phase of a multi-phase program that surveys and documents the condition of access ramps throughout the City for Building Code and ADA compliance. This project constructed a new access ramp, retaining walls, and handrails, entering the park on Tamarisk adjacent to the new stairs, and joining the existing lower walkway near the tot lot playground. Project Plans and Specifications are available for review:

ADA Ramp Improvements, Phase 8 - Plans
ADA Ramp Improvements, Phase 8 - Specifications
 Fall 2016
Saddleback Ranch Traffic Enhancements This project provided traffic calming improvements such as re-striping, corner bulb-outs, medians, and parkway landscaping on Saddleback Ranch Road in the vicinity of Portola Hills Elementary school.

Saddleback Ranch Road Concept Plan
Saddleback Ranch Road Traffic Calming Project
Spring 2016
Regional Traffic Signal Synchronization (TSSP) The project included the synchronization of traffic signals across multi-jurisdictional boundaries along 5 major arterial roadways in the City. There are 3 additional roadways currently underway.

Jeronimo Road
Lake Forest Drive
Los Alisos Boulevard
Santa Margarita Parkway
Trabuco Road





Fall 2015
Spring 2015
Winter 2014
Fall 2015
Summer 2015
Signalized Intersection at Rancho Parkway and Sports Park Access Road This project constructed a signalized intersection on Rancho Pkwy. at the Sports Park access road to serve the City's Sports Park and the adjacent development north of the Park. April 2015
ADA Ramp Improvements- Phase 7 Phase 7 construction reconstructed 39 existing ADA compliant ramps in the neighborhoods around Lake Forest Drive, from Pittsford to Regency Lane. Spring 2015
Lake Forest Sports Park and Recreation Center (PDF) Development of an 86-acre sports park and recreation center located on the corner of Rancho Parkway and Portola Parkway (28000 Rancho Parkway). November 2014
Annual Sports Field Renovations and Rye Seeding (PDF) City park and turf renovations are performed annually. Varies
Bake Parkway Resurfacing-Completed (PDF) The project replaced deteriorated pavement on Bake Parkway between Portola Parkway and Lake Forest Drive. Fall 2014
Slurry Seal on the Streets of Foothill Ranch (PDF) The annual project performed street repairs on residential streets in Foothill Ranch. Fall 2014