Wednesday, May 16, 2012
 
Home
About Us
Calendars
Services
City Hall
Departments
How Do I...
Contact Us
Homepage > ... > Public Works > Water Quality > Construction ActivitiesPrint friendly formatE-mail story
  • Send a link
  • Contact Us
  • Capital Improvement Projects
  • Engineering Services
  • Expand The Forest
  • Landscape Maintenance
  • Public Works Fee Schedule
  • Recycling
  • Water Quality
  • Frequently Asked Questions
  • Contact Us
  • Recently Completed Projects
  • Projects Currently Underway
  • Rockfield Boulevard Streetscape
  • Local Implementation Plan (LIP)
  • Water Quality Management Plan (WQMP)
Construction Activities
Water Quality - Construction Activities - _Erosion Control BMPs
Section UL
 EC-01 Scheduling 
 EC-02 Preservation of Existing Vegetation 
 EC-03 Hydraulic Mulch 
 EC-04 Hydroseeding 
 EC-05 Soil Binders 
 EC-06 Straw Mulch 
 EC-07 Geotextiles and Mats 
 EC-08 Wood Mulching 
 EC-09 Earth Dikes and Drainage Swales 
 EC-10 Velocity Dissipation Devices 
 EC-11 Slope Drains 
 EC-12 Streambank Stabilization 
 EC-13 Reserved 
 EC-14 Compost Blanket 
 EC-15 Soil Preparation & Roughening 
 EC-16 Non-Vegetative Stabilization 
Water Quality - Construction Activities - _Non Stormwater BMPs
Section UL
 NS-01 Water Conservation Practices 
 NS-02 Dewatering Operations 
 NS-03 Paving and Grinding Operations 
 NS-04 Temporary Stream Crossing 
 NS-05 Clear Water Diversion 
 NS-06 Illicit Connection & Discharge 
 NS-07 Potable Water & Irrigation 
 NS-08 Vehicle and Equipment Cleaning 
 NS-09 Vehicle and Equipment Fueling 
 NS-10 Vehicle and Equipment Maintenance 
 NS-11 Pile Driving Operations 
 NS-12 Concrete Curing 
 NS-13 Concrete Finishing 
 NS-14 Material Over Water 
 NS-15 Demolition Adjacent to Water 
 NS-16 Temporary Batch Plants 
Water Quality - Construction Activities - _Sediment Control BMPs
Section UL
 SE-01 Silt Fence 
 SE-02 Sediment Basin 
 SE-03 Sediment Trap 
 SE-04 Check Dam 
 SE-05 Fiber Rolls 
 SE-06 Gravel Bag Berm 
 SE-07 Street Sweeping and Vacuuming 
 SE-08 Sandbag Barrier 
 SE-09 Straw Bale Barrier 
 SE-10 Storm Drain Inlet Protection 
 SE-11 Active Treatment Systems 
 SE-12 Temporary Silt Dike 
 SE-13 Compost Socks and Berms 
 SE-14 Biofilter Bags 
Water Quality - Construction Activities - _Tracking Control BMPs
Section UL
 TC-01 Stabilized Construction Entrance & Exit 
 TC-02 Stabilized Construction Roadway 
 TC-03 Entrance & Outlet Tire Wash 
Water Quality - Construction Activities - _Waste Management BMPs
Section UL
 WM-01 Material Delivery and Storage 
 WM-02 Material Use 
 WM-03 Stockpile Management 
 WM-04 Spill Prevention and Control 
 WM-05 Solid Waste Management 
 WM-06 Hazardous Waste Management 
 WM-07 Contaminated Soil Management 
 WM-08 Concrete Waste Management 
 WM-09 Sanitary & Septic Waste Management 
 WM-10 Liquid Waste Management 
Water Quality - Construction Activities - _Wind Erosion BMPs
Section UL
 WE-01 Wind Erosion Control 
Copyright 2012 - www.lakeforestca.govTerms & Conditions / Privacy Policy
City Hours: 8:00 a.m. to 6:00 p.m. City Hall is closed every other Friday
Powered byCivica Software